Refurbishment and upgrades
Changes to supply routes, distribution, connections and technical infrastructure.
Industry
Existing buildings require a sound technical survey, planned interventions and traceable records.
Changes of use, tenant fit-outs and technical upgrades affect existing installations. ELSTU defines conditions, interfaces and the required scope before work starts.
Changes to supply routes, distribution, connections and technical infrastructure.
Extensions or changes to networks, CCTV, security and fire detection.
Project-specific checks, records and updates to available documentation.
Access, operating hours, required shutdowns and handover points are coordinated with facility management, occupants and adjacent trades.
ELSTU defines the electrical scope, interfaces and handover points precisely. Capability is demonstrated through clearly described services, a traceable process and documented project experience.
Next step
Project type, location, scope and available documents provide a useful basis for an initial technical review.